LHC Structure & Documents - Under Construction

AC Sector
1990 to 1995
AT Division
1990 to 1995
LHC Division
1996 to 2002
AT Department
2003 to 2008
ATS /ACC Sector
2009 to Present
BE, TE, EN and SY Departments

 1990 - 1995
Accelerator Sector (AC)

AC Division Leader

G. Plass (1990-1995)

AC Series AC Reports AC Notes    
AC Divisional reports
by year
1990 1991 1992 1993 1994 1995   ALL 
AC-DI Divisional Leader's Office M. Buhler-Broglin
AC-BLIT Bureau de Liaison pour l'Industrie et la Technologie / 
Industry and Technology Liaison Office
O. Barbalat
AC-FA Future Accelerators G. Brianti
AC-LEP200/L200 LEP200 C. Wyss
AC-LHC LHC  

 

 1990 - 1995
Accelerator Technology Division (AT)

AT Division Leader

H. Wenninger (1990-1993)
J.P. Gourber (1994-1995)

AT Documents AT Reports AT Notes Internal Notes Technical Notes
Specifications      
AT Divisional reports
by year
1990 1991 1992 1993 1994 1995   ALL 
AT Technical & Internal notes by year 1990 1991 1992 1993 1994 1995   ALL 
AT-DI Divisional Leader's Office J.P. Gourber
AT-CR Cryogenics M. Mopurgo
AT-CO    
AT-CV Cooling and Ventilation M. Schmitt
AT-ET    
AT-IC Industrial Controls  
AT-MA Magnets R. Perin
AT-RF Radio Frequency  
AT-SM Surface and Materials C. Benvenuti
AT-SU Survey M. Mayoud
AT-VA Vacuum H.P. Reinhard

 

 1996 - 2002
Large Hadron Collider Division (LHC)

LHC Division Leader

J.P. Gourber (1996-1998)
P. Lebrun (1999-2008)

LHC Series LHC Reports LHC Notes LHC Technical Notes LHC Internal Notes
LHC Project Reports LHC Project Notes Specifications  
LHC Divisional reports
by year
1996 1997 1998 1999 2000 2001 2002 ALL 
LHC Technical & Internal notes by year 1996 1997 1998 1999 2000 2001 2002 ALL 
LHC-ADM Divisional Leader's Office A. Guiard-Marigny
LHC-ACR Cryogenics for Accelerators W. Erdt
LHC-CRI Cryostat & Integration A. Poncet
LHC-ECR Cryogenics for Experiments and Test Areas J.P. Dauvergne
LHC-DLO Division Leader Office  
LHC-EET Emerging Energies Technologies C. Rubbia
LHC-IAS Industrial Automation & Supervision M. Rabany
LHC-ICP Insertions, Correctors & Protection N. Siegel
LHC-MMS Main Magnets & Superconductors C. Wyss
LHC-MTA Magnet Tests & Analysis P. Sievers
LHC-VAC Vacuum O. Gröbner
LHC-Notes LHC Notes 1983 - 1999
LHC-Project-Reports LHC Project Reports 1996 - 2012
LHC-Project-Notes LHC Project-Notes 1995 - 2006
LHC Committees  
LMB LHC Management Board
LHC MAC LHC Machine Advisory Committee (LHC MAC)
TCC LHC Technical Co-ordination Committee (TCC)
MARIC LHC MAin Ring Committee (MARIC)
MMMG  Monday Morning Meeting (MMMG)
  LHC Experiment Machine Interface Committee (LEMIC)
TC LHC Technical Committee (TC)
  LHC Steering Committee for Magnets and Cryogenics
P&LC Parameters and Layout Committee (P&LC)
  LHC with four feed points Committee
LCB LHC Computing Board (LCB)
LEB LHC Electronics Board (LEB)
  Energy Calibration meetings

 

 2003 - 2008
Accelerator Technology Department (AT)

AT Leader

P. Lebrun (1990-1995)

AT Series AT Reports AT Notes AT Specifications  
       
AT reports
by year
2003 2004 2005 2006 2007 2008   ALL 
AT-ADM Administration  D. Duret
AT-MAS Magnets & Superconductors, 2003-2006 L. Rossi
AT-MCS Magnets, Cryostats & Superconductors, 2007-2008 L. Rossi
AT-MEI Magnet Electrical System & Instruments, 2008 L. Walckiers
AT-MEL Magnets & Electrical Systems, 2003-2007 K.H. Mess
AT-MTM Magnet Terst & Measurements, 2003-2007 L. Walckiers
AT-CRI Cryostats & interconnections, 2003-2006 A. Poncet
AT-ACR Cryogenics for Accelerators, 2003-2007 L. Tavian
AT-ECR Cryogenics for Experiments, 2003-2007 G. Passardi
AT-CRG Cryognics, 2008 L. Tavian
AT-VAC Vacuum, 2003-2008 P. Strubin / J.M. Jimenez
AT Committees    
  LHC Technical Board  
MARIC LHC Main Ring Committee  
MEB Magnet Evaluation Board  
LCC LHC Commissioning Committee  
LEMIC LHC Experiment Machine Interface Committee  
TCC LHC Technical Coordination Committee  
MPP Main Ring Magnet Performance Panel  
ICC Installation and Commissioning Committee  
FiDeL Field Description for LHC  

 

 2009 - Present

Accelerators and Technology Sector (ATS/ACC) comprises four departments:

Beams Department (BE)
Engineering Department (EN)
Technology Department (TE)
Accelerators Systems (SY)

ATS / ACC Sector Leader

S. Myers (2009-2013)
F. Bordry (2014-2020)
M. Lamont (2021-2025)
O. Bruning (2026-Present)

ATS / ACC Series ATS Reports ATS Notes AT Specifications  
ATS-DO      
ATS / ACC Reports
by year
2009 2010 2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022 2023 2024
2025 2026            
ATS-DO Directorate Office  
ATS-DO Directorate Office: Medical Accelerators, Physics Beyond Collider, Consolidation, Safety, Energy Coordination, Sustainability  
ATS-DO Directorate office: High Luminosity LHC, FCC, Linear Colliders, EU projects, CERN Accelerators  
Beam Department (BE): P. Collier (2009-2020) - R. Jones (2021-2025) - M. Meddahi (2026-Present)
 
BE Series BE Reports BE Notes BE Specifications  
       
BE Reports & Notes
by year
2009 2010 2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022 2023 2024
2025 2026            
BE-HDO Head departmental Office P. Collier
BE-ABP Accelerators & Beams Physics G. Arduini / O. Brüning / Y.Papaphilippou
BE-ASR Administration, Safety & Resources R. Billen / J.P. Matheys / M. Gourber-Pace
BE-BI Beam Instrumentation R. Jones
BE-CEM Controls Electronics & Mechanics A. Masi
BE-CSS Controls software & Services C. Roderick
BE-CO Controls E. Hatziangeli
BE-EA Experimental Areas S. Evrard
BE-GM Geodetic Metrology H. Mainaud Durand
BE-ICS Industrial Controls & Safety Systems (2009-2010) P. Sollander / E. Blanco Vinuela
BE-OP Operation R. Steerenberg / M. Lamont / B. Mikulec
BE-RF Radio Frequency E. Jensen / E. Ciapala
Technology Department (TE): F. Bordry (2009-2013) - J.M. Jiménez (2014-2025) - R. Jones (2026-Present)
 
TE-ABT Accelerator Beam Transfer B. Goddard
TE-EPC Electrical Power Converters J.P. Burnet
TE-MSC Magnets, Superconductors & Cryostats L. Bottura
TE-PPR Projects, Planning & Resources L. van den Boogaard
TE-CRG Cryogenics D. Delikaris
TE-MPE Machine Protection & Electrical Integrity A. Siemko
TE-VSC Vacuum, Surfaces & Coating P. Chiggiato
Engineering Department (EN): V. Vuillemin (2009-2010) - R. Saban (2011-2015) - R. Losito (2016-2020) - K. Foraz (2021-2025) - S. Atieh (2026-Present)
 
EN-DHO Department Head Office R. Losito
EN-ARO Administration, Resources & Performance L. Serio
EN-EA Experimental Areas M. Brugger
EN-HE Handling Engineering I. Ruehl
EN-SMM Survey, Mechatronics Measurements A. Masi
EN-ACE Accelerator Coordination & Engineering K. Foraz
EN-CV Cooling & Ventilation M. Nonis
EN-EL Electrical Engineering N. Bellegarde
EN-MME Mechanicals & Material Engineering F. Bertinelli
EN-STI Sources, Trargets & Interactions S. Silvano Gilardoni
Accelerators Systems Department (SY): B. Goddard (2021-2025) - R. Losito (2026-Present)
 
SY-ABT Accelerator Beam Transfer  
SY-AR Adminbistration and Resources  
SY-BI Beam Instrumentation  
SY-EPC Electrical Power Converters  
SY-RF Radio Frequency  
SY-STI Sources, Targets and interactions  

 

Last modified
18 February, 2026